samedi 2 août 2014

Driveway Part 1 (Aug 1)

We decided to redo our driveway this summer. Here are pictures of the crew doing the excavation of the old asphalt and the root systems from tree stumps and bushes. They then installed the framing and the rebar. They will return after the long weekend to pour the concrete and finish the project. Looks good already!









1 commentaire:

Mamie a dit…

Bravo, bon début. J'espérais un trottoir en demi-lune!